State Public Safety Grant Guide

North Carolina Public Safety Grants

Verified funding pathways, actual award examples, drone surveillance law, and practical federal procurement and cybersecurity guidance.

Funding pathways17
Verified award examples5
2027 drone billsNot enacted
State fiscal yearJul. 1 – Jun. 30

North Carolina public-safety buyers can explore GCC justice grants, NC Emergency Management preparedness and cybersecurity awards, NCDOT highway-safety funding, and direct federal opportunities. Verify the current notice, applicant eligibility, project fit and equipment rules before building a budget.

The attached 2027 foreign-drone cutoff is from proposed SB 670/HB 707, which have not become law. Existing state surveillance and location rules do apply to UAS missions. Federal award dollars can separately restrict a purchase or operation. For the national framework, read MAXSUR’s NDAA, TAA, FCC & Blue UAS guide.

Homeland SecurityNC Emergency Management
Traffic SafetyNCDOT GHSP
Drone SurveillanceG.S. 15A-300.1
State CybersecurityNCDIT Security Policies
Federal UAS AwardsOMB M-26-02

Planning update: Projected grant dates are replaced with administrator guidance. The former FY2024 Local JAG amounts were formula allocations and should not be described as actual awards.

North Carolina Drone Procurement & Cybersecurity

Proposed 2027 Ban, Enacted Surveillance Law and Federal Awards

Separate the unpassed manufacturer bills from today’s operational requirements and the conditions on federal funding.

Reviewed Sep. 28, 2026

Current snapshot: SB 670 was last referred to Senate Rules on March 26, 2025; HB 707 was last re-referred to House Rules on April 15, 2025. Neither bill shows enactment. The July 1, 2027 cutoff and void-contract remedy in HB 707 are proposed text. G.S. 15A-300.1 currently restricts certain UAS surveillance with law-enforcement and emergency-management exceptions. Federal-award rules apply independently.

Origin policy

2027 Bills Not Enacted

HB 707 and SB 670 should be tracked as proposals, not purchasing mandates.

State operations

Surveillance Restrictions

G.S. 15A-300.1 governs nonconsensual surveillance and lists mission-specific exceptions.

Federal awards

ASDA Screening

OMB M-26-02 restricts federal funds for FASC-prohibited UAS procurement or operation.

NC HSGP

Prior FEMA Approval

NCEM says a small UAS is aircraft and requires justification, SOP and prior approval.

SB 670 and HB 707: A Proposed Cutoff

HB 707’s 2025 committee substitute would add a procurement prohibition for the State and political subdivisions covering UAS manufactured or assembled by listed foreign entities, including specified links to China and Russia. It proposes a July 1, 2027 effective date and says a violating contract is void. SB 670 is a related Senate proposal.

The official bill histories show neither measure passed. Accordingly, July 2027 is not a currently enacted North Carolina hard cutoff, and its void-contract provision is not an existing remedy. Review any later legislation and the buyer’s present agency policy before placing an order.

Enacted NC Drone Surveillance Rules

G.S. 15A-300.1 generally bars UAS surveillance of a person, occupied dwelling/curtilage or private real property without the specified consent and restricts certain photos intended for public dissemination. The law lists police exceptions including a search warrant, lawful plain view, defined urgent circumstances, qualifying terrorism risk and photographs of public gatherings. Emergency-management agencies have an express exception for their emergency-management functions.

Violations can support a civil action and affect evidence admissibility. Set a mission approval, data retention and dissemination policy that documents the statutory basis as well as applicable FAA and privacy requirements.

Corrections and Forest-Fire Missions

G.S. 15A-300.3 generally restricts UAS flight within 500 horizontal feet or 250 vertical feet of a local confinement or state/federal correctional facility, with written-consent and specified public-safety/emergency exceptions. G.S. 15A-300.4 restricts flight within 3,000 horizontal or vertical feet of a North Carolina Forest Service forest fire, with consent, Forest Service and specified law-enforcement exceptions.

Mission planners should verify the exact location, authorizing official and exception before launch; state exceptions do not replace FAA airspace authority.

Federal Funds: ASDA, HSGP and BJA

OMB M-26-02, Appendix D generally bars federal award funds from procuring, or being used in connection with operating, a FASC-prohibited UAS since December 22, 2025, subject to exemptions and waivers. A locally owned aircraft is not automatically suitable for a federally funded mission.

NCEM’s HSGP guidance says small UAS are aircraft requiring prior FEMA approval, detailed operational justification and the requesting agency’s SOP before obligation. Separately, BJA’s September 2026 guidance requires express prior approval, a Blue UAS Cleared List-related certification, and privacy and cybersecurity assurances for BJA-funded UAS. Ask the actual administrator about cost eligibility; neither program is a general drone subsidy.

Cybersecurity, Cameras, Cloud and Other Federal Tests

NCDIT’s Statewide Information Security Manual is a baseline required for executive-branch agencies; local governments should apply their own rules and any connected-system contracts. In 2026 NCDIT began a GovRAMP transition for vendor-hosted products and services handling executive-branch state data. Document storage, telemetry, access, encryption, updates, logs, cloud service authorization and incident response for an integrated UAS or surveillance system.

Section 889 covered telecommunications/video-surveillance restrictions, FCC Covered List/equipment authorization, TAA clauses and Blue UAS vetting are separate tests. Verify the exact aircraft, cameras, radios, controllers and contract or grant conditions. Read the federal procurement explainer for their distinct scopes.

Practical North Carolina UAS Procurement Checklist

  1. Confirm the law’s status. SB 670 and HB 707 remain proposals; do not treat their July 2027 date, named-country test or void-contract remedy as enacted requirements.
  2. Identify each funding source and mission. Separate local/state funding from federal direct or pass-through awards and determine whether funds support acquisition or operation.
  3. Apply NC surveillance law. Map the mission to G.S. 15A-300.1, including consent, a warrant, or a specified law-enforcement or emergency-management exception.
  4. Screen federal UAS restrictions. For federal award money, check ASDA and OMB M-26-02 FASC status, exemptions and waivers; ask the awarding agency about the exact cost.
  5. Obtain program-specific UAS approval. NC HSGP treats sUAS as aircraft requiring prior FEMA approval and a detailed justification; BJA-funded UAS require separate express approval and Blue UAS certification.
  6. Review cameras, networks and cloud. Check applicable Section 889 clauses, FCC equipment authorization, state or local IT requirements, vendor access, firmware and data location.
  7. Verify flight restrictions and retain records. Check FAA authority and any corrections/forest-fire location exception; keep procurement, grant, cybersecurity and mission approvals together.

Project record: An “NDAA compliant” label alone does not establish compliance with North Carolina’s surveillance rules, federal award restrictions, FCC authorization, grant approvals or IT policy.

Funding Pathways

North Carolina Grant Opportunities

These are real program pathways, including restricted, closed and future-cycle options. Links lead to official administrators or program notices.

Grant / Program Level Administrator Project Fit Status / Deadline
NC GCC State Byrne JAG Federal pass-through Governor’s Crime Commission / BJA Justice projects selected under current GCC priorities and award terms; equipment must be expressly eligible Check GCC annual RFA and EBS application process
BJA FY2026 Direct Local JAG Federal direct BJA Formula-eligible NC jurisdictions and approved justice projects; separate from GCC state JAG Grants.gov Oct. 9; JustGrants Oct. 16, 2026 (ET)
NC GCC Byrne State Crisis Intervention Program Federal pass-through Governor’s Crime Commission / BJA Authorized crisis intervention, gun-violence prevention and related program projects Check GCC priorities and current RFA; no blanket equipment authorization
NC GCC Project Safe Neighborhoods Federal pass-through Governor’s Crime Commission / DOJ partners Eligible district violence-reduction strategies through selected fiscal-agent/partner structure Partner and project-specific; contact GCC
NC GCC Paul Coverdell Forensic Science Federal pass-through Governor’s Crime Commission / BJA Eligible forensic laboratory quality and efficiency projects Restricted applicants; check GCC notice
NC GCC STOP Violence Against Women / Title II Federal pass-through Governor’s Crime Commission Eligible survivor response or youth justice projects under each program’s distinct terms Check current GCC program priorities and RFA
NC Homeland Security Grant Program – SHSP Federal pass-through NC Emergency Management / FEMA DPR-approved terrorism preparedness equipment, training, planning and exercises FY25 and FY26 state applications closed; ask regional DPR about FY27
NC HSGP – Charlotte Area UASI Federal pass-through NC Emergency Management / FEMA Designated Charlotte-area risk-based preparedness investments FY25 and FY26 closed; designated urban area only
NC Emergency Management Performance Grant Federal pass-through NC Emergency Management / FEMA County emergency-management work-plan and all-hazards capability Existing county awards; check NCEM for next cycle and approved budget
NC State and Local Cybersecurity Grant Program Federal pass-through NC Emergency Management / FEMA-CISA One approved cyber-risk reduction project by eligible local, tribal, community-college or state applicant FY25 application closed Nov. 30, 2025; 40% match in that round
NC Capacity Building Competitive Grant State NC Emergency Management Eligible county emergency-management capability gaps and incident coordination Prior CBCG awards documented; check NCEM for a new appropriation/round
NC Governor’s Highway Safety Program Federal pass-through NCDOT GHSP / NHTSA Impaired driving, occupant protection, police traffic services and traffic records Applications normally Jan. 1–31 for an Oct.–Sep. award year; next posted cycle controls
NC Nonprofit Security Grant Program Federal pass-through NC Emergency Management / FEMA Eligible high-risk 501(c)(3) security improvements; not general police funding FY26 state application closed July 24, 2026
BJA Body-Worn Camera Program Federal direct BJA Eligible agency body-camera policy and implementation; separate from UAS FY26 first stage closed Sep. 25; Oct. 2 JustGrants only for first-stage applicants
COPS School Violence Prevention Program Federal direct COPS Office Approved school-safety measures in the federal notice FY26 round closed; monitor next notice
COPS Technology and Equipment Program Federal direct COPS Office Congressionally designated policing technology/equipment projects Invitation-only; not open competition
FEMA Assistance to Firefighters Grant Federal direct FEMA Eligible fire and EMS equipment and training under current AFG notice Monitor next federal notice and exact allowable costs

Application mechanics: GCC uses reimbursement, NCID/EBS access and program-specific priorities; many sources require match. NC HSGP requires DPR-approved projects and its FY25/FY26 local application rounds are closed. NCDOT GHSP normally accepts applications January 1–31; check its current posting before planning the next year.

Award Intelligence

Verified North Carolina Public-Safety Awards

NC Emergency Management published these 2024 CBCG recipients and project descriptions. These historical awards do not establish a current open cycle.

Recipient Program Published Project Award Announced
Ashe County NCEM 2024 CBCG Unmanned Aircraft Project and Logistics Storage Project $56,011 June 19, 2024
Gates County NCEM 2024 CBCG Disaster alerting, response and messaging $90,000 June 19, 2024
Washington County NCEM 2024 CBCG Search and rescue program enhancement $94,600 June 19, 2024
Pitt County NCEM 2024 CBCG Emergency message board trailers $80,950 June 19, 2024
Johnston County NCEM 2024 CBCG Shelter generator and transfer switch $200,000 June 19, 2024

Source: NCEM 2024 Capacity Building Competitive Grant recipients. Ashe County’s published award explicitly includes an unmanned-aircraft project. It does not establish allowability under a different grant, especially a federal award.

North Carolina UAS Procurement FAQ

Common North Carolina Questions

Confirm the current legislation, mission and exact award terms at the time of purchase or flight.

Did North Carolina enact a July 1, 2027 foreign-drone cutoff?

No. HB 707 was last referred to House Rules on April 15, 2025, and SB 670 to Senate Rules on March 26, 2025. The July 2027 effective date and void-contract provision appear in proposed HB 707 text, not an enacted North Carolina drone-purchasing law.

Can North Carolina police use a drone for surveillance?

G.S. 15A-300.1 generally restricts nonconsensual UAS surveillance of people, homes and private property, but lists law-enforcement exceptions such as a warrant, lawful plain view, specific exigencies, public gatherings and an identified terrorism risk. Emergency-management activities have a separate statutory exception.

Is a foreign-manufactured drone automatically allowed with local funds?

No categorical statewide origin ban was identified in the enacted law reviewed, but the agency must still follow its procurement and IT rules, NC surveillance law, FAA requirements and any separate federal-project restrictions.

What if a grant buys or operates the aircraft?

OMB M-26-02, Appendix D generally restricts federal award funds used to procure or in connection with operating a FASC-prohibited UAS, subject to exemptions and waivers. NC HSGP also requires prior FEMA approval for small UAS, with a justification and SOP; BJA has its own express approval and Blue UAS certification.

Are Section 889, TAA, FCC and Blue UAS interchangeable?

No. Section 889 concerns specified covered telecom and video-surveillance equipment and services; TAA depends on the procurement clause; FCC authorization and Covered List status are product-specific; Blue UAS is a vetting pathway and may be an express grant condition.

Does the state IT manual apply to every city and county?

NCDIT says its Statewide Information Security Manual supplies a required baseline for executive branch agencies. Local agencies should check their own rules and connected-state-system contracts. NCDIT’s 2026 GovRAMP transition concerns vendor-hosted services for executive agencies.

Were the former Local JAG numbers actual awards?

The old table called FY2024 formula allocations awards. An allocation is not proof of an executed award. The examples here instead come from NC Emergency Management’s public announcement of CBCG recipients, including an Ashe County unmanned-aircraft project.

Procurement Pathway

Move From Grant Approval to a Documented Purchase

Confirm equipment eligibility, UAS mission authority, federal supply-chain and FCC status, state or local IT review, and any required FEMA or BJA approval before ordering.

Cooperative purchasing does not waive grant conditions or public-agency procurement rules. Confirm the purchase method with the procurement office and grant administrator.