State Public Safety Grant Guide
New Hampshire Public Safety Grants
Verified funding pathways and New Hampshire drone, foreign-technology and cybersecurity procurement guidance for public-safety agencies.
New Hampshire buyers can pursue direct federal justice funding, state-administered preparedness and highway-safety grants, and municipal cybersecurity services when the published program and mission fit. A grant category is a starting point: establish eligibility, project purpose, allowable costs, procurement terms and data security before requesting a quote.
HB 1444 added RSA chapter 162-V in 2026. It sets a January 2028 cutoff for nonqualifying state and local drone acquisitions. Executive Order 2025-04 separately directs state-agency technology security. Read MAXSUR’s NDAA, TAA, FCC & Blue UAS guide for the distinct federal frameworks.
Planning update: The former page’s “no statewide ban” and blanket “NDAA-compliance required if purchasing with federal funds” summaries are outdated or overbroad. Its FY2024 Local JAG figures were formula allocations, not proof of awards, so the award-example table and projected deadlines are removed.
New Hampshire Procurement & Cybersecurity
What HB 1444 and the Foreign-Technology Order Mean for Buyers
The statutory UAS purchase rule and the executive-branch network rule have different buyers, dates and product scopes.
2028 Acquisition Cutoff
Only systems cleared under the local standard referenced in RSA 162-V:3 may be purchased or acquired.
NDAA 2024 + FCC Test
Counties, cities, towns and political subdivisions face the statute’s 2024 NDAA and FCC Covered List criteria.
Foreign-Technology Controls
EO 2025-04 addresses risky foreign technology purchased or used by state agencies and state computer systems.
ASDA Is Separate
Federal award funds have a distinct FASC-prohibited UAS restriction, with stated exceptions and waivers.
State Purchases: RSA 162-V:2
Beginning January 1, 2028, a New Hampshire state agency may purchase or acquire only a drone cleared pursuant to RSA 162-V:3. Before that date it must buy such systems to the extent practicable. From the cutoff, state funds may not pay for a purchase prohibited by the state-agency provision. A contract made in violation of this section is void and unenforceable.
The cross-reference to RSA 162-V:3 matters: the enacted text does not establish a separate Blue UAS clearance list for state agencies. Verify the federal and FCC criteria and any additional agency procurement rules for the actual system.
Local Purchases: RSA 162-V:3
From January 1, 2028, a county, city, town or other political subdivision may not purchase or acquire a drone that fails the requirements of the National Defense Authorization Act of 2024, Public Law 118-31, or that has been included on the FCC Covered List. A purchase or acquisition contract violating this section is void and unenforceable.
The statute is an acquisition rule. It does not create the pre-2028 “to the extent practicable” direction for local buyers, and it does not expressly make operation of an already acquired fleet unlawful. The actual NDAA provisions, FCC listing, agency policy and funding terms require a product-specific assessment.
Executive Order 2025-04: Broader Technology
Governor Ayotte’s October 2025 order addresses foreign-adversary cybersecurity risks in state agencies and their computer systems, including procurement or use of covered risky hardware and software. State-agency buyers should check DoIT/CISO guidance and the current prohibited-technology list before connecting camera systems, networking gear, controllers or applications to a state network.
It is a separate executive-branch measure, not a blanket municipal camera ban. Review any contract, exceptions and security approval with the state IT and procurement offices.
Federal Award and Surveillance Clauses
OMB M-26-02, Appendix D implements the American Security Drone Act restriction on federal award funds to procure or operate FASC-prohibited UAS, subject to applicable exemptions and waivers. BJA requires express prior approval and certifications for UAS purchases with BJA awards.
Section 889 covers specified telecommunications and video-surveillance equipment and services in its own federal context. FCC equipment authorization, the FCC Covered List, TAA and Blue UAS serve different purposes. The New Hampshire statute explicitly names the 2024 NDAA and FCC Covered List; do not substitute an unrelated “NDAA compliant” marketing label.
Build a Cybersecurity Record
Capture the aircraft, payload, camera, radio, controller, firmware and cloud providers. Document vendor access, update source, data routing and residency, encryption, authentication, retention, logging and incident response. Have state IT review executive-branch network connections and seek grant administrator approval for award-funded technology.
Practical New Hampshire UAS Procurement Checklist
- Identify the buyer and money. Record whether the purchaser is a New Hampshire state agency or a county, city, town or other political subdivision, and whether any federal or state funds pay for the system.
- Apply the correct 2028 test. For state agencies, follow RSA 162-V:2 and its cross-reference to RSA 162-V:3; for local governments, check the 2024 NDAA requirements and the FCC Covered List as RSA 162-V:3 specifies.
- Plan for the transition now. Before January 1, 2028, state agencies are directed to buy cleared aircraft to the extent practicable. Document that assessment and the purchase date; do not claim this phrase creates a local exception.
- Review state-network technology. For an executive-branch buyer, check Executive Order 2025-04 and current DoIT/CISO guidance before procuring, installing or connecting cameras, radios, controllers, software or cloud components.
- Check federal terms separately. Screen any federal award-funded UAS against the ASDA/OMB restriction; evaluate Section 889 surveillance/telecom clauses, FCC authorization, TAA and Blue UAS only where applicable.
- Document cybersecurity and allowability. Capture the aircraft and component bill of materials, firmware source, data residency, cloud access, encryption, updates, retention and grant administrator approval; seek BJA prior UAS approval if applicable.
- Keep procurement and flight records. Preserve vendor attestations, Covered List checks, contract terms, grant and agency approvals, FAA authorization and operator records with the file.
Need the wider federal picture? Read NDAA, TAA, FCC & Blue UAS Explained for separate federal procurement and grant tests. The New Hampshire provisions above determine the state-specific purchase analysis.
Funding Pathways
New Hampshire Grant Opportunities
These are administrator-linked programs and current or recent notices. Project eligibility and allowable equipment are determined by each solicitation, not by this table.
| Grant / Program | Level | Administrator | Project Fit | Status / Deadline |
|---|---|---|---|---|
| BJA FY2026 Local JAG Formula | Federal direct | BJA | Listed New Hampshire jurisdictions; eligible justice equipment or technology under the specific award | Open: Grants.gov Oct. 9 / JustGrants Oct. 16, 2026 (ET) |
| New Hampshire Byrne JAG State Program | Federal pass-through | NH DOJ Grants Management Unit | State-led criminal justice priorities; NH reports substantial use for its statewide Attorney General’s Drug Task Force | Check NH DOJ for any subaward notice; not a general open UAS grant |
| New Hampshire Homeland Security Grant Program | Federal pass-through | NH Department of Safety / FEMA | Risk-based preparedness equipment, training and exercises in the approved state strategy | FY2026 grant announcement posted; check state instructions and window |
| New Hampshire State and Local Cybersecurity Grant Program | Federal pass-through | NH DoIT / FEMA-CISA | Municipal and school-district cybersecurity, shared services and approved information-system protection | Check DoIT for current projects, services and applications |
| NH Office of Highway Safety Grants | Federal pass-through | NH Office of Highway Safety / NHTSA | Traffic safety enforcement, education, crash-data and related eligible equipment | Check the annual application and current program page |
| NH MDT / Electronic Crash Reporting Equipment | Federal pass-through | NH Office of Highway Safety | Electronic crash and citation reporting equipment under the program rules | Check OHS equipment grant instructions and funds |
| NH Speed Equipment Grant | Federal pass-through | NH Office of Highway Safety | Speed-enforcement equipment for eligible law-enforcement agencies | Check OHS equipment grant instructions and funds |
| NH Collision Analysis & Reconstruction Equipment / Training | Federal pass-through | NH Office of Highway Safety | Crash-investigation equipment and training under the state program | Check OHS program instructions and funds |
| BJA FY2026 Body-Worn Camera Program | Federal direct | BJA | Body-camera policy and implementation for eligible law enforcement; distinct from drones | Grants.gov first stage closed Sep. 25; JustGrants Oct. 2 only for first-stage applicants |
| COPS FY2026 School Violence Prevention Program | Federal direct | COPS Office | Eligible school-security technology and coordination under the federal notice | FY2026 round closed Aug. 11; check next notice |
| COPS FY2026 Technology and Equipment Program | Federal direct | COPS Office | Only congressionally designated recipients invited to apply for specified technology projects | FY2026 invitational round closed; not an open competition |
| FEMA Assistance to Firefighters Grant | Federal direct | FEMA | Eligible fire and EMS equipment or training under the published notice | Check next federal notice and equipment rules |
Near-term: Direct FY2026 Local JAG lists October 9, 2026 for Grants.gov and October 16 for JustGrants, both Eastern time, for formula-eligible jurisdictions. The BJA FY2026 body-camera first stage closed September 25; October 2 is a second-stage deadline only for those who already filed through Grants.gov. State grant windows should be confirmed with the administrator.
Grant Planning
Match the New Hampshire Mission to a Real Program
The project narrative should link a verified applicant and allowable cost to a measurable public-safety outcome.
Justice and investigations
BJA’s direct Local JAG formula program serves listed jurisdictions. NH DOJ’s state JAG program is administered around state priorities, including its statewide drug task force; do not assume every local agency can apply for a separate open technology subaward.
Homeland security and response
New Hampshire Department of Safety administers homeland-security funding under state and federal priorities. Proposals for interoperable systems, preparedness equipment and training need an eligible applicant, current state notice, approved capability and documented costs.
Municipal cybersecurity
NH DoIT’s SLCGP supports municipal and school-district cyber resilience, including shared services. Define the information-system risk, controls and provider review. A drone or camera should not be counted as an eligible cyber expense without written program approval.
Traffic safety equipment
NH Office of Highway Safety publishes programs for crash-reporting terminals, speed equipment and collision analysis as well as broader enforcement and education. Those program-specific pages are stronger equipment matches than an unspecified general technology grant.
Schools, body cameras and fire
COPS SVPP, BJA body cameras and FEMA AFG have distinct applicant and equipment rules. COPS TEP is a congressional-designation invitation, not a grant open to all departments. The FY2026 COPS SVPP round has closed.
Purchase sequence: identify the award and buyer; ask the administrator about the proposed UAS or surveillance system; check RSA 162-V, EO 2025-04 where applicable and federal award terms; document cybersecurity; then complete procurement and flight approvals.
New Hampshire UAS Procurement FAQ
Common New Hampshire Compliance Questions
Apply the enacted text to the purchaser, exact system, acquisition date and funding source.
When does New Hampshire’s new drone procurement law apply?
HB 1444, chapter 95, took effect July 27, 2026. Its state and local purchase/acquisition cutoffs begin January 1, 2028. Before that date, state agencies must purchase qualifying systems to the extent practicable.
Does the law make Blue UAS certification mandatory for state agencies?
The enacted RSA 162-V:2 says state agencies may acquire only drones cleared pursuant to RSA 162-V:3 beginning January 1, 2028. Section 162-V:3 uses the 2024 NDAA requirements and FCC Covered List; it does not name Blue UAS as a standalone state clearance program.
What must a city, town or county check?
Starting January 1, 2028, RSA 162-V:3 prohibits a locality from acquiring a drone that does not meet the requirements of the National Defense Authorization Act of 2024, Public Law 118-31, or that is included on the FCC Covered List. Confirm the particular aircraft and system with procurement counsel.
Does a prohibited purchase make the contract void?
Yes. RSA 162-V:2 and :3 state that a contract or agreement for a purchase or acquisition in violation of those sections is void and unenforceable. Check the actual contract and the applicable January 2028 cutoff before issuing an order.
Does Executive Order 2025-04 apply to every New Hampshire municipality?
The order addresses state-agency technology and executive-branch systems. Its state-network procurement and use controls should not be described as a universal municipal technology ban. Municipal buyers still must follow their own policy, RSA 162-V and any federal award conditions.
Can a locally funded foreign drone be purchased before January 2028?
RSA 162-V:3’s local purchase cutoff begins January 1, 2028. That does not waive a city’s own purchasing or cybersecurity policy, a federal-award restriction, FCC equipment requirements, or other applicable law. Verify the exact product and funding.
Does the new law prohibit flying an older fleet after 2028?
RSA 162-V:2 and :3 are framed around purchase or acquisition, not a general ban on operating aircraft acquired earlier. Existing aircraft still face federal grant conditions, FAA rules, agency policy and applicable cybersecurity requirements.
Can a grant pay for a drone or camera system?
Only when the program and administrator allow the cost. Federal award funds are restricted for FASC-prohibited UAS procurement and operation under the American Security Drone Act guidance, subject to its exemptions and waivers. BJA-funded UAS purchases require express prior approval and certifications.
MAXSUR Solution Pathways
Connect New Hampshire Funding to Field Capability
Match equipment and cybersecurity controls to the eligible mission and approved budget.
Procurement Pathway
Move From Grant Approval to a Documented Purchase
Confirm RSA 162-V, executive-branch technology approval when applicable, federal award terms and the administrator’s project approval before ordering.
Cooperative purchasing does not waive grant allowability or agency procurement rules. Confirm the purchase method and exact system with the administrator and procurement office.